{"id":8931,"date":"2017-02-06T16:07:41","date_gmt":"2017-02-06T15:07:41","guid":{"rendered":"http:\/\/vinci-construction-projets.com\/en\/infographie\/etudes-de-prix-planification\/"},"modified":"2022-11-14T10:49:51","modified_gmt":"2022-11-14T09:49:51","slug":"price-analysis-planning","status":"publish","type":"page","link":"https:\/\/www.vinci-construction-projets.com\/en\/our-know-how\/our-areas-of-expertise\/price-analysis-planning\/","title":{"rendered":"Price analysis and planning"},"content":{"rendered":"<h4 class=\"p1\">A UNIQUE UNDERSTANDING OF PROJECTS<\/h4>\n<p class=\"p1\">We produce the costing and planning of projects in the tender phase in close collaboration with the teams in charge of design, methods and procurement. Together, we develop a clear and detailed construction scenario and propose optimisations and variants for a more efficient, sustainable and economical construction project.<\/p>\n<p class=\"p1\"><a href=\"http:\/\/vinci-construction-projets.com\/fr\/assiout2-2\/\" rel=\"attachment wp-att-8748\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-8748 size-full\" src=\"http:\/\/vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2.jpg\" alt=\"assiout2\" width=\"598\" height=\"339\" srcset=\"https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2.jpg 598w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-300x170.jpg 300w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-400x227.jpg 400w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-503x285.jpg 503w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-386x219.jpg 386w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-353x200.jpg 353w, https:\/\/www.vinci-construction-projets.com\/wp-content\/uploads\/2017\/02\/Assiout2-285x162.jpg 285w\" sizes=\"auto, (max-width: 598px) 100vw, 598px\" \/><\/a>Our specialist price analysis personnel have engineering training, ensuring a <strong>full understanding of the structure to be designed and the means necessary for its realisation<\/strong>. In addition, our planning teams <strong>draw up the schedule for the construction site in advance<\/strong>, an operation that is now essential for the design of projects in BIM mode. Interfaces, deadlines and costs for design and construction are therefore finely tuned.<\/p>\n<p>The teams also provide support to projects in the execution phase on planning aspects and, for the price analysis teams, in relation to new projects or the preparation of a claim file.<\/p>\n<h5 class=\"p1\">Spotlight on Assiut dam<\/h5>\n<p class=\"p1\"><em>For the construction of the <a href=\"http:\/\/vinci-construction-projets.com\/en\/realisations\/new-assiut-dam\/\" target=\"_blank\" rel=\"noopener\">new dam in Assiut<\/a>, The technical variant we proposed for the construction of the new Assiut dam reduced the budget by 15% compared to our competitors&#8217; offer. Instead of the complex work of immersed concrete, the design offices at the headquarters in France and Cairo opted to lower the level of the Nile and its water table by 28 m by means of a temporary dyke and a pumping system. This enabled the foundation work to be carried out in dry conditions, even during the legendary floods of the Egyptian river.<\/em><\/p>\n<h4 class=\"p1\"><\/h4>\n<h4 class=\"p1\"><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>A UNIQUE UNDERSTANDING OF PROJECTS We produce the costing and planning of projects in the tender phase in close collaboration with the teams in charge of design, methods and procurement. Together, we develop a clear and detailed construction scenario and propose optimisations and variants for a more efficient, sustainable and economical construction project. Our specialist [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":0,"parent":8690,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-8931","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/pages\/8931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/comments?post=8931"}],"version-history":[{"count":8,"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/pages\/8931\/revisions"}],"predecessor-version":[{"id":18540,"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/pages\/8931\/revisions\/18540"}],"up":[{"embeddable":true,"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/pages\/8690"}],"wp:attachment":[{"href":"https:\/\/www.vinci-construction-projets.com\/en\/wp-json\/wp\/v2\/media?parent=8931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}