Dam

We were mandated by the Comisión Federal de Electricidad to construct a double-curvature arch dam measuring 207 metres high and 115 metres long at the ridge. This project included a diversion tunnel, a spillway tunnel capable of evacuating 3,000 m3/s, 2 tunnels (618 m long), a water intake, 21 kilometres of concrete-lined intake gallery, a surge chamber, a sloped penstock pipe and an underground plant equipped with two 146-megawatt turbines.